Refurbishment of 1st Floor offices within the Grade II listed main station building

Norwich Station

Value: £245,000

Programme: 10 Months

Novastar carried out both the Mechanical & Electrical fit out of the refurbished 1st floor offices at the Grade II listed Norwich Train Station. The space provided office space as well as training facilities, meeting rooms, kitchen, break room and toilets. A new sub main was run circa 130m from an existing panelboard at the other end of the station and brought into supply a new panelboard in the loft space which involved out of hours whole station shut downs to make the final connections. Existing distribution boards, containment and cabling within the loft space were adapted or replaced as required to facilitate the refurbishment.